Argo Data Center is a data center under construction in Post, United States. Our footprint estimate of its power is about 53 MW.

Power demand is growing at this site

Key facts

StatusUnder construction
Facility power53 MW (range 21 MW to 133 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 444,024 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 23,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.77726, -100.86890

Satellite view

Questions

How much power does Argo Data Center use?

We estimate the facility power at about 53 MW. Estimate from building footprint, low confidence.