Arcola Tech Park
Arcola Tech Park is an operational data center operated by Microsoft in Brambleton, United States. Our footprint estimate of its power is about 33 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 33 MW (range 13 MW to 82 MW) Estimate from building footprint, low confidence. Footprint estimate: about 272,782 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 14,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Microsoft IAD11 |
| Coordinates | 38.94927, -77.55563 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Arcola Tech Park use?
We estimate the facility power at about 33 MW. Estimate from building footprint, low confidence.
What chips does Arcola Tech Park use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Who operates Arcola Tech Park?
Microsoft.
Data centers near Brambleton
- Microsoft 331 m · 15 MW
- Yondr Allegro South 504 m · 60 MW
- Tech Park at Brambleton 2.1 km · 27 MW
- Google Arcola Building 3 2.2 km · 61 MW
- Google Data Center 2.6 km · 45 MW
- Amazon Fadeley III 2.9 km · 22 MW
- CyrusOne Sterling NVA9 4.4 km · 49 MW
- CyrusOne NVA9 4.7 km · 15 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.