Core Scientific Pecos TX Data Center
Core Scientific Pecos TX Data Center is an operational data center in Pecos, United States. Our footprint estimate of its power is about 30 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 30 MW (range 12 MW to 76 MW) Estimate from building footprint, low confidence. Footprint estimate: about 252,392 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (AMD possible) Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD. |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Farm to Market Road 2119 1851, 79772, Pecos |
| Coordinates | 31.53407, -103.80334 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Core Scientific Pecos TX Data Center use?
We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.
What chips does Core Scientific Pecos TX Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).
Data centers near Pecos
- Data center in Pecos 289 m · 1 MW
- Data center in Pecos 314 m · 4.9 MW
- Core Scientific COT2 Data Center 1.4 km · 18 MW
- IONIC Digital Cedarvale 33.7 km · 38 MW
- Cipher Digital data center in Kermit 71.6 km · 40 MW
- Lonestar Dream -Tarbush Site 71.9 km · 28 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.