Data Center Directory

Core Scientific Pecos TX Data Center

Core Scientific Pecos TX Data Center is an operational data center in Pecos, United States. Our footprint estimate of its power is about 30 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).

Key facts

StatusOperational
Facility power30 MW (range 12 MW to 76 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 252,392 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (AMD possible)
Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD.
GPU capacity if all AIabout 13,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressFarm to Market Road 2119 1851, 79772, Pecos
Coordinates31.53407, -103.80334

Satellite view

Questions

How much power does Core Scientific Pecos TX Data Center use?

We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.

What chips does Core Scientific Pecos TX Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).

Data centers near Pecos

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.