Meta Los Lunas is an operational data center that is still expanding, operated by Meta in Los Lunas, United States. Its power is about 147 MW, growing to about 273 MW by 2028-01. Epoch AI estimates about 134,000 H100-equivalent AI chips (B300).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorMeta
UsersMeta
Facility power147 MW
Reported (Epoch AI or owner data)
IT power118 MW
Planned power273 MW by 2028-01-01
Epoch AI timeline projection.
AI compute134,000 H100-equivalents → 869,000 planned
AI chipsB300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 66,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 4.5 billion → 8.3 billion planned
Epoch AI estimate, 2025 USD.
Also known asMeta
Address4250 Messenger Lp, Los Lunas, NM 87031
Coordinates34.83016, -106.78383

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-07-2400Land clearing starts for new building.
2026-03-01114 MW100,000Building 1 is operational, based on no construction activity around the shell and cooling equipment, and about 5 months passing after structural completion.
2026-07-28114 MW100,000Building 2 (a tent-like building) shell is complete, but we don't believe it's operational because there is unpaved ground, no cars parked right in front, the first tent buildings at Meta Prometheus took about 16 months (it's been 10 months for this building). North-west of Building 1, the outline of a building of similar dimensions and style to Meta Jeffersonville's Building 1 is visible, this is labeled as Building 3. West of Building 1 we see more land clearing for what could be a building similar to Meta Jeffersonville's Building 2.
2026-10-26147 MW134,000Building 2 (a tent like building) is operational. Based on a default estimate of 3 months for fit-out after structural completion in July.
2028-01-01 (projected)273 MW869,000Building 3 is estimated to be operational. This is estimated from the timeline of similar buildings at other Meta sites.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-03-01B30039,453Estimate
2026-10-26B30053,061Estimate
2028-01-01B30098,523Estimate

Satellite view

Questions

How much power does Meta Los Lunas use?

Public data puts the facility power at about 147 MW, with about 273 MW planned by 2028. Reported (Epoch AI or owner data).

What chips does Meta Los Lunas use?

Reported chips: B300.

Who operates Meta Los Lunas?

Meta. Reported users: Meta.

Data centers near Los Lunas

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.