Data center in Manassas is an operational data center in Manassas, United States. Our footprint estimate of its power is about 28 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 28 MW (range 14 MW to 46 MW) Estimate from building footprint, low confidence. Footprint estimate: about 23,734 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Infantry Ridge Road 7777, 20109, Manassas |
| Coordinates | 38.80485, -77.51241 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Manassas use?
We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.
Data centers near Manassas
- Equinix DC14 229 m · 3.2 MW
- Amazon IAD-7 2.7 km · 13 MW
- Amazon IAD-11 3.0 km · 10 MW
- Amazon Web Services data center in Bull Run 3.5 km · 9.8 MW
- Amazon IAD-95 3.8 km · 65 MW
- Amazon IAD-85 3.9 km · 65 MW
- Iron Mountain VA-7 4.1 km · 33 MW
- Iron Mountain Data Center - Manassas (VA-1) 4.2 km · 40 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.