Data Center Directory

Meta Prineville Data Center

Meta Prineville Data Center is an operational data center operated by Meta in Prineville, United States. Our footprint estimate of its power is about 238 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power238 MW (range 95 MW to 594 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,979,242 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 100,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMeta
Coordinates44.29801, -120.88712
Websitefacebook.com/prinevilledatacenter

Satellite view

Questions

How much power does Meta Prineville Data Center use?

We estimate the facility power at about 238 MW. Estimate from building footprint, low confidence.

What chips does Meta Prineville Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

Who operates Meta Prineville Data Center?

Meta.

Data centers near Prineville

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.