Lumen Cleveland is an operational data center in Cleveland, United States. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,659 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.50507, -81.65778 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Lumen Cleveland use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
Data centers near Cleveland
- Fusion - Cleveland 1.9 km
- Zayo Cleveland - 1525 Rockwell Ave 2.2 km · 81 MW
- DataBank Cleveland (CLE1) 2.2 km
- Cogent Cleveland 2 2.7 km
- Tech Mahindra Cleveland 3.1 km
- Expedient Cleveland - 151 NEO 11.0 km
- T5@Cleveland 14.0 km · 15 MW
- T5@Cleveland 14.1 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.