Data Center Directory

CyrusOne San Antonio II

CyrusOne San Antonio II is an operational data center operated by CyrusOne in Leon Valley, United States. Our footprint estimate of its power is about 19 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power19 MW (range 9.4 MW to 30 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 15,673 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCyrusOne San Antonio III
Coordinates29.47089, -98.67305
Websitecyrusone.com/data-center-locations/texas/san-antonio-texas-ii

Satellite view

Questions

How much power does CyrusOne San Antonio II use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne San Antonio II?

CyrusOne.

Data centers near Leon Valley

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.