Data center in Jersey Village
Data center in Jersey Village is an operational data center in Jersey Village, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,240 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 29.82158, -95.57080 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Jersey Village use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
Data centers near Jersey Village
- Databank Houston West (HOU3) 2.7 km
- Databank Houston West (HOU1) (HOU2) 2.9 km
- Data Foundry Houston 1 12.5 km
- Databank Houston Galleria (HOU5) 16.0 km
- EdgeConneX Houston (EDCHOU01) 17.1 km
- Element Critical Houston HOU1 18.0 km · 3.3 MW
- DXC Technology data center in Cypress 19.3 km · 33 MW
- Data Foundry Houston 2 19.7 km · 10 MW