Marquette-Adams Telephone Coop is an operational data center in Portage, United States. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 1 MW (range 0.5 MW to 1.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 867 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 43.78218, -89.57484 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Marquette-Adams Telephone Coop use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
Data centers near Portage
- Data center in Baraboo 19.9 km
- SupraNet Communications Madison 78.7 km
- University of Wisconsin-Madison 80.2 km
- Network 222 80.3 km
- Data center in Madison 80.3 km · 0.9 MW
- 612 W Main 80.8 km
- EdgeConneX Madison (EDCMAD01) 84.7 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.