Google Mesa

Google Mesa is an operational AI data center operated by Google in Mesa, United States. Its power is about 237 MW. Epoch AI estimates about 290,000 H100-equivalent AI chips (TPU v6e, TPU v5p).

Key facts

StatusOperational
OperatorGoogle
Facility power237 MW
Reported (Epoch AI or owner data)
IT power183 MW
AI compute290,000 H100-equivalents
AI chipsTPU v6e, TPU v5p
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 100,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 6.9 billion
Epoch AI estimate, 2025 USD.
Coordinates33.41510, -111.83146 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-08-0100Land clearing begins for the entire site.
2025-07-01126 MW110,000Building 1 is operational. This is based on the state of construction on 2025-03-02 as seen on [Google Earth](https://earth.google.com/web/@33.35450568,-111.67805903,407.02398359a,2119.1496037d,35y,-0h,0t,0r/data=ChYqEAgBEgoyMDI1LTAzLTAyGAFCAggBQgIIAEoNCP___________wEQAA), where building shell and external components seems to have been completed, but there is still a lot of construction equipment present. That equipment appears to have been cleared up by this date, 4 months later, with the 2025-09-07 satellite imagery providing an upper bound. Construction has begun on the Building 2 roof, with work beginning on the areas for cooling and generators as well.
2025-09-07126 MW110,000Building 2 roof is mostly completed. Building 2's backup generators are almost complete, and cooling is a little more than halfway complete. The Building 2 substation is also under construction.
2026-05-15126 MW110,000Building 2 is close to being operational. There is only construction left on the backup generators, which are almost complete. Some equipment is also strewn around the building, especially near the air-cooled chillers. Preparation seems to have begun for Building 3 at the site.
2026-08-15237 MW290,000Building 2 is operational. This is estimated based on the close-to-complete construction status from May 2026.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-07-01TPU v6e109,631Estimate
2025-07-01TPU v5p18,447Estimate

Satellite view

Questions

How much power does Google Mesa use?

Public data puts the facility power at about 237 MW. Reported (Epoch AI or owner data).

What chips does Google Mesa use?

Reported chips: TPU v6e, TPU v5p.

Who operates Google Mesa?

Google.