Lonestar Dream -Tarbush Site
Lonestar Dream -Tarbush Site is an operational data center in Fort Stockton, United States. Our footprint estimate of its power is about 28 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 28 MW (range 11 MW to 70 MW) Estimate from building footprint, low confidence. Footprint estimate: about 232,802 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 31.10372, -103.23836 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Lonestar Dream -Tarbush Site use?
We estimate the facility power at about 28 MW. Estimate from building footprint, low confidence.
Data centers near Fort Stockton
- IONIC Digital Cedarvale 49.7 km · 38 MW
- Cipher Digital data center in Kermit 67.1 km · 40 MW
- Data center in Pecos 71.6 km · 1 MW
- Core Scientific Pecos TX Data Center 71.9 km · 30 MW
- Data center in Pecos 72.0 km · 4.9 MW
- Core Scientific COT2 Data Center 73.1 km · 18 MW