OVH US East Vint Hill
OVH US East Vint Hill is an operational data center in New Baltimore, United States. Our footprint estimate of its power is about 9.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 9.6 MW (range 4.8 MW to 15 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,015 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Watson Court 6872, 20187 |
| Coordinates | 38.74742, -77.67446 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does OVH US East Vint Hill use?
We estimate the facility power at about 9.6 MW. Estimate from building footprint, low confidence.
Data centers near New Baltimore
- Digital Realty GNV (8217 Linton Hall) 7.5 km
- Amazon IAD-197 7.6 km · 27 MW
- Digital Realty VA4 7.7 km · 12 MW
- Amazon IAD-55 7.8 km · 37 MW
- Amazon Web Services data center in Gainesville 7.9 km · 15 MW
- NTT VA10 8.1 km · 122 MW
- Google Mango Farm 8.3 km · 60 MW
- Google Mango Farm Building 3 8.4 km · 62 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.