Oracle
Oracle is an operational data center in Hillsboro, United States. Our footprint estimate of its power is about 6.4 MW. Likely chips: NVIDIA GPUs (some AMD Instinct) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.4 MW (range 3.2 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,361 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some AMD Instinct) Guess from the operator, not confirmed. Oracle Cloud sells NVIDIA and AMD GPU capacity. |
| GPU capacity if all AI | about 2,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northeast 79th Avenue 3380, 97124, Hillsboro |
| Coordinates | 45.54391, -122.89648 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Oracle use?
We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.
What chips does Oracle use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some AMD Instinct).
Data centers near Hillsboro
- TGN Hillsboro 357 m · 2.6 MW
- Stack Infrastructure Portland PORO2 403 m · 28 MW
- Digital Realty Portland - PDX10 538 m · 8.9 MW
- Flexential - Portland/Hillsboro (PDX01) 639 m · 6.8 MW
- EdgeConneX Portland (EDCPOR01) 985 m
- Verizon Hillsboro (Tanasbourne) Data Center 1.1 km · 8.8 MW
- EdgeConneX - Portland POR03 1.9 km · 8.4 MW
- Flexential - Portland/Hillsboro 2 (PDX02) 2.2 km · 24 MW