QTS Eagle Mountain

QTS Eagle Mountain is a data center under construction operated by Meta in Eagle Mountain, United States. No power figure is public for this site yet. Likely chips: B300.

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorMeta
UsersMeta (speculative)
Planned power411 MW by 2027-07-01
Epoch AI timeline projection.
AI chipsB300
Reported (Epoch AI or owner data)
Address652 E Hyperscale Way, Eagle Mountain, UT 84013
Coordinates40.26889, -112.03429

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-10-0100First signs of site preparation show up on satellite imagery.
2025-09-0800Site preparation continues. Outline of a first building that is not the data center of interest Buildings 1 or 2 is visible.
2026-05-0200Building 1 roof finished. Satellite imagery shows construction vehicles and concrete pads with no air cooled chiller units indicating Buildings 1 and 2 cooling install continues. On the other side of each building, emergency generator install continues as well.
2026-12-31 (projected)274 MW231,000We estimate Buildings 1 and 2 will be fully operational by the end of 2026 because there are at least seven months since cooling and emergency generators have started to be installed. This estimate is also in line with similar QTS data center campus construction timelines.
2027-07-01 (projected)411 MW347,000We estimate Building 3 will be fully operational by H2 2027 following a similar time line to Buildings 1 and 2 of 14 months from land clearing to operational.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-12-31B30091,553Estimate
2027-07-01B300137,330Estimate

Satellite view

Questions

What chips does QTS Eagle Mountain use?

Reported chips: B300.

Who operates QTS Eagle Mountain?

Meta. Reported users: Meta.

Data centers near Eagle Mountain

More Meta data centers

Sources