SU Green Data Center
SU Green Data Center is an operational data center operated by Syracuse University in Onondaga, United States. Our footprint estimate of its power is about 2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Syracuse University |
| Facility power | 2 MW (range 1 MW to 3.2 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,652 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 850 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Skytop Road 623, 13210, Onondaga |
| Coordinates | 43.01208, -76.11593 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does SU Green Data Center use?
We estimate the facility power at about 2 MW. Estimate from building footprint, low confidence.
Who operates SU Green Data Center?
Syracuse University.
Data centers near Onondaga
- Northland Communications - Syracuse 4.6 km
- Lightboard ⭑ New York 5.1 km
- Greenidge Power Plant and Data Center 77.3 km · 20 MW
- Westelcom Networks Watertown 108.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.