Microsoft Fairwater Atlanta
Microsoft Fairwater Atlanta is an operational AI data center operated by Microsoft in Fayetteville, United States. Its power is about 859 MW. Epoch AI estimates about 769,000 H100-equivalent AI chips (B200).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Users | OpenAI (likely), Microsoft (likely) |
| Project | Microsoft AI WAN |
| Facility power | 859 MW Reported (Epoch AI or owner data) |
| IT power | 636 MW |
| AI compute | 769,000 H100-equivalents |
| AI chips | B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 350,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 24.1 billion Epoch AI estimate, 2025 USD. |
| Energy partners | Georgia Power |
| Address | 1435 Hwy 54 W, Fayetteville, GA 30214 |
| Coordinates | 33.44549, -84.52412 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-04-09 | 0 | 0 | Land clearing begins for southern part (Building 1-2) |
| 2025-10-14 | 433 MW | 388,000 | Building 1 and 2 are [operational](https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/). Building 1 looked operational sooner, but the buildings [are paired](https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/) in the Fairwater design. The roof of Building 4 is almost complete, while mechanical equipment is still being installed. |
| 2026-02-13 | 433 MW | 388,000 | Building 4 roof is complete and all mechanical equipment appears to be installed. However, there is still a lot of construction activity around the building. |
| 2026-05-15 | 433 MW | 388,000 | Building 4 still has some equipment strewn around the perimeter, so we think it is still going through commissioning. Two new buildings at the campus have shells underway, but we don't know if Microsoft is the tenant for those. |
| 2026-06-14 | 859 MW | 769,000 | Building 3 and 4 are operational. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-10-14 | B200 | 153,563 | Estimate |
| 2026-06-14 | B200 | 304,279 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Fairwater Atlanta use?
Public data puts the facility power at about 859 MW. Reported (Epoch AI or owner data).
What chips does Microsoft Fairwater Atlanta use?
Reported chips: B200.
Who operates Microsoft Fairwater Atlanta?
Microsoft. Reported users: OpenAI, Microsoft.
Data centers near Fayetteville
- QTS 357 m · 31 MW
- QTS 601 m · 31 MW
- QTS 1.9 km · 57 MW
- QTS 2.1 km · 39 MW
- Microsoft East Point Datacenter Campus 21.8 km · 36 MW
- Digital Realty Data Center 25.6 km · 23 MW
- Westlake Data Center 29.9 km · 14 MW
- Microsoft 30.8 km · 3.9 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
- Microsoft Grange Castle Ireland
Sources
Correct this page or get the data