PowerHouse CTP-03 is a data center under construction in Hopewell, United States. Our footprint estimate of its power is about 54 MW.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Facility power | 54 MW (range 22 MW to 135 MW) Estimate from building footprint, low confidence. Footprint estimate: about 450,049 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 23,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.35445, -77.33387 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does PowerHouse CTP-03 use?
We estimate the facility power at about 54 MW. Estimate from building footprint, low confidence.
Data centers near Hopewell
- Virginia Information Technologies Agency 719 m · 23 MW
- Digital Fortress: Richmond 868 m · 45 MW
- PowerHouse CTP-02 946 m · 2.3 MW
- PowerHouse CTP-02 994 m · 15 MW
- CoreWeave Chester VA 9.3 km · 114 MW
- RIC3 DC5 15.5 km · 54 MW
- QTS Richmond 3 Data Center 15.7 km · 76 MW
- Meta data center in Sandston 15.9 km · 12 MW