Data center in Northlake
Data center in Northlake is an operational data center in Northlake, United States. Our footprint estimate of its power is about 6.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.4 MW (range 3.2 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,368 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.93405, -87.91624 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Northlake use?
We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.
Data centers near Northlake
- Microsoft - Azure Datacenter 1.2 km · 28 MW
- Ascent - CH2 1.6 km
- Aligned Data Center - Chicago ORD-01 2.2 km · 18 MW
- Aligned Chicago (ORD-01) 2.3 km
- Digital Realty CHI (9333 Grand Ave) 4.8 km
- Digital Realty CHI (9377 Grand Ave) 4.8 km · 26 MW
- TierPoint Chicago - West 4.9 km
- Element Critical Chicago CH2 6.1 km · 7.8 MW
Sources
Correct this page or get the data