Key facts

StatusOperational
OperatorCenturylink
Facility power6.9 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,744 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNorth Nash Street 200, 90245, El Segundo
Opened1976
Coordinates33.91773, -118.38622

Satellite view

Questions

How much power does Centurylink data center in El Segundo use?

We estimate the facility power at about 6.9 MW. Estimate from building footprint, low confidence.

Who operates Centurylink data center in El Segundo?

Centurylink.