NTT VA8
NTT VA8 is a data center under construction operated by NTT Global Data Centers in Ashburn, United States. Our footprint estimate of its power is about 16 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | NTT Global Data Centers |
| Facility power | 16 MW (range 7.9 MW to 25 MW) Estimate from building footprint, low confidence. Footprint estimate: about 13,170 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | NTT VA9 |
| Address | Gigabit Plaza 44725, 20147, Ashburn |
| Coordinates | 39.01875, -77.47556 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NTT VA8 use?
We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.
Who operates NTT VA8?
NTT Global Data Centers.
Data centers near Ashburn
- NTT Ashburn Campus 326 m · 21 MW
- RagingWire VA3 - NTT 428 m
- Sabey Intergate.Ashburn 444 m · 30 MW
- DataBank Ashburn (IAD1) 605 m · 13 MW
- Equinix DC13 687 m · 16 MW
- Aligned IAD-01 716 m · 78 MW
- Aligned Ashburn (IAD-01) 729 m
- Data center in Ashburn 821 m · 4.9 MW
More NTT Global Data Centers data centers
- NTT VA10 United States
- NTT Frankfurt 2 Data Center (FRA2) Germany
- NTT PH1 Datacenter United States
- NTT Japan
- NTTData Data Center United States
- NTT Hemel Hempstead 4 Data Center (HH4) United Kingdom
- NTT Berlin 1 Data Center (BER1) Germany
- NTT London 1 United Kingdom