Data Center Directory

Microsoft Texas Research Park Campus

Microsoft Texas Research Park Campus is an operational data center operated by Microsoft in Lackland Air Force Base, United States. Our footprint estimate of its power is about 87 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power87 MW (range 35 MW to 218 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 726,523 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 37,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft
Coordinates29.41560, -98.80379

Satellite view

Questions

How much power does Microsoft Texas Research Park Campus use?

We estimate the facility power at about 87 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Texas Research Park Campus use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft Texas Research Park Campus?

Microsoft.

Data centers near Lackland Air Force Base

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.