Google Columbus
Google Columbus is an operational data center that is still expanding, operated by Google in Columbus, United States. Its power is about 364 MW, growing to about 464 MW by 2027-07. Epoch AI estimates about 332,000 H100-equivalent AI chips (TPU v5e, TPU v5p, TPU v6e, TPU v7).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | |
| Users | Google DeepMind (speculative) |
| Facility power | 364 MW Reported (Epoch AI or owner data) |
| IT power | 303 MW |
| Planned power | 464 MW by 2027-07-01 Epoch AI timeline projection. |
| AI compute | 332,000 H100-equivalents → 576,000 planned |
| AI chips | TPU v5e, TPU v5p, TPU v6e, TPU v7 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 170,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 11.5 billion → 14.6 billion planned Epoch AI estimate, 2025 USD. |
| Address | 5076 S High St, Columbus, OH 43207 |
| Coordinates | 39.86145, -83.00400 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2021-10-01 | 0 | 0 | Land clearing begins on the eastern half of the site, for Buildings 1-2 |
| 2023-07-01 | 0 | 0 | Building 2 foundation work begins. Building 1 generators seem complete, cooling towers still under construction. |
| 2024-04-01 | 78 MW | 33,000 | Building 1 operational. No visible construction and roads/parking complete around the building. Building 2 chillers are beginning construction. Foundation work begins for Building 3. |
| 2025-03-01 | 156 MW | 90,000 | Building 2 operational. Parking complete, no more visible construction. |
| 2025-10-01 | 260 MW | 211,000 | Building 3 operational. Surrounding roads finished, no more visible construction. |
| 2026-02-21 | 260 MW | 211,000 | Buildings 1-3 are visibly operational, with steam coming out of the cooling towers. Meanwhile Building 4 is extremely close to completion, with all backup generators complete with only 3 cooling towers missing their fans. ~1/2 the generators are installed for Building 5, and the roof is mostly complete (starting to install the final white layer, with the actual roof structure already complete). |
| 2026-05-01 | 364 MW | 332,000 | Building 4 operational. No more visible construction, and since only 3 fans needed to be installed since Feburary, operational date was likely soon after. Building 5 roof almost complete. |
| 2026-08-05 | 364 MW | 332,000 | Confirmation that Building 4 is complete. Building 5 has progressed since February, with a complete roof, all backup generators in place, and five cooling towers in place. |
| 2027-07-01 (projected) | 464 MW | 576,000 | Building 5 operational. The [transmission line construction notice](https://www.aeptransmission.com/ohio/docs/Hartman%20Farms%20Extension%20No.%202%20138%20kV%20Transmission%20Line%20Project%20Construction%20Notice.pdf) that expands site by 100 MW is assumed to be entirely for Building 5, and has an in-service date of July 1, 2027 (page 3). Estimate taken on the safe side based on completion times for Building 3-4 from when roof was complete. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-04-01 | TPU v5e | 147,878 | Estimate |
| 2024-04-01 | TPU v5p | 7,425 | Estimate |
| 2025-03-01 | TPU v6e | 41,245 | Estimate |
| 2025-03-01 | TPU v5p | 28,246 | Estimate |
| 2025-03-01 | TPU v5e | 193,949 | Estimate |
| 2025-10-01 | TPU v6e | 172,060 | Estimate |
| 2026-05-01 | TPU v6e | 204,638 | Estimate |
| 2026-05-01 | TPU v7 | 38,886 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Columbus use?
Public data puts the facility power at about 364 MW, with about 464 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Google Columbus use?
Reported chips: TPU v5e, TPU v5p, TPU v6e, TPU v7.
Who operates Google Columbus?
Google. Reported users: Google DeepMind.
Data centers near Columbus
- Google 1.3 km · 26 MW
- Google Lockbourne, OH 1.6 km · 111 MW
- Amazon Web Services 20.1 km · 25 MW
- Data center in Hilliard 20.5 km · 36 MW
- Amazon Web Services 20.6 km · 28 MW
- Oppidan data center in Hilliard 23.7 km · 11 MW
- Amazon AWS: Hilliard Data Center 24.7 km · 32 MW
- Amazon Web Services 25.5 km · 28 MW
More Google data centers
- Goodnight United States
- Google Fort Wayne United States
- Google Omaha United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
- Google Cedar Rapids United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.