Data Center Directory

Intergate Seattle East Building 4

Intergate Seattle East Building 4 is an operational data center operated by Digital Realty in Tukwila, United States. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorDigital Realty
Facility power12 MW (range 6.1 MW to 20 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 10,168 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSouth 120th Place 3433, 98168, Tukwila
Coordinates47.49340, -122.28888

Satellite view

Questions

How much power does Intergate Seattle East Building 4 use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

Who operates Intergate Seattle East Building 4?

Digital Realty.

Data centers near Tukwila

More Digital Realty data centers

Sources

Correct this page or get the data