Verizon Wireless is an operational data center in Goodlettsville, United States. Our footprint estimate of its power is about 2.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 2.8 MW (range 1.1 MW to 6.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,993 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 36.28218, -86.79714 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Verizon Wireless use?
We estimate the facility power at about 2.8 MW. Estimate from building footprint, low confidence.
Data centers near Goodlettsville
- Tennessee Processing Center LLC 7.5 km · 8.6 MW
- Level(3) Nashville (9th Ave) 10.4 km
- H5 Data Centers Nashville 13.4 km
- IRIS - Nashville 13.4 km
- XO Nashville 13.9 km
- Zayo Nashville - 209 10th Ave. S 14.2 km
- Data center in Nashville 16.0 km · 1.2 MW
- EdgeConneX Nashville (EDCNAS01) 17.5 km