Data Center Directory

Microsoft data center in Cheyenne

Microsoft data center in Cheyenne is an operational data center operated by Microsoft in Cheyenne, United States. Our footprint estimate of its power is about 5.3 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power5.3 MW (range 2.7 MW to 8.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,458 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 2,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCYS41 Datacenter
Coordinates41.12529, -104.89808

Satellite view

Questions

How much power does Microsoft data center in Cheyenne use?

We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.

What chips does Microsoft data center in Cheyenne use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft data center in Cheyenne?

Microsoft.

Data centers near Cheyenne

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.