QTS Phoenix 2 Campus
QTS Phoenix 2 Campus is an operational data center in Phoenix, United States. Our footprint estimate of its power is about 50 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 50 MW (range 20 MW to 126 MW) Estimate from building footprint, low confidence. Footprint estimate: about 418,720 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 21,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.46260, -111.99965 |
| Website | q.com/data-centers/phoenix-2 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Phoenix 2 Campus use?
We estimate the facility power at about 50 MW. Estimate from building footprint, low confidence.
Data centers near Phoenix
- QTS 301 m · 18 MW
- QTS 302 m · 18 MW
- QTS Phoenix (PHX2) 359 m
- Stack Infrastructure PHX02 Campus 687 m · 27 MW
- Iron Mountain Data Center - Phoenix (AZP-1) 2.3 km · 21 MW
- Iron Mountain Data Center - Phoenix (AZP-2) 2.4 km · 4 MW
- DataBank Phoenix (PHX2) 2.4 km
- PhoenixNAP 5.3 km · 14 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.