Anthropic-Amazon New Carlisle
Anthropic-Amazon New Carlisle is an operational data center that is still expanding, operated by Amazon Web Services in New Carlisle, United States. Its power is about 1.2 GW, growing to about 2.3 GW by 2028-03. Epoch AI estimates about 818,000 H100-equivalent AI chips (Trainium2).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Amazon Web Services |
| Users | Anthropic |
| Project | Project Rainier |
| Facility power | 1.2 GW Reported (Epoch AI or owner data) |
| IT power | 1.0 GW |
| Planned power | 2.3 GW by 2028-03-17 Epoch AI timeline projection. |
| AI compute | 818,000 H100-equivalents → 1.7 million planned |
| AI chips | Trainium2 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 580,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 39.3 billion → 72.9 billion planned Epoch AI estimate, 2025 USD. |
| Water use | 21.00 million gallons per day |
| Address | 55001 Larrison Blvd, New Carlisle, IN 46552 |
| Coordinates | 41.70569, -86.50982 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-02-09 | 0 | 0 | Land clearing begins in the northern section |
| 2024-06-10 | 0 | 0 | Land clearing begins in the southern section |
| 2025-05-10 | 0 | 0 | Roof complete on building 11 |
| 2025-06-23 | 478 MW | 300,000 | Buildings 1-7 are operational. Based on all of the roofs being completed for over 5 months. |
| 2025-09-26 | 478 MW | 300,000 | Roof complete on building 16. Generators are being installed for buildings 8-15. In the north, Building 17 and 18 are under construction. To the south of buildings 8-16, a concrete pad is visible, and an expanded car park next to it. |
| 2025-10-17 | 478 MW | 300,000 | Confirmation that nearly 500,000 chips are operational, which fits buildings 1-7. In an [interview](https://www.youtube.com/watch?v=jwgW_gHI1Vs&t=220s), AWS CEO says "they're already running...about 500,000 [Trainium2] chips in Indiana today". |
| 2025-12-23 | 751 MW | 471,000 | Buildings 8-11 are operational, given it's been over 7 months since their roofs were complete, and the backup generators and roof chimneys look complete. The roof is almost complete for Building 17 and 18. |
| 2026-02-09 | 751 MW | 471,000 | Buildings 12-16 still have a few generators that look incomplete, so they are unlikely to be operational just yet. Buildings 17-18 still have ongoing roof work, no generators. Just south of Buildings 9-16, the outlines of a site for Buildings 19-32 are taking shape. |
| 2026-03-23 | 1.1 GW | 686,000 | Buildings 12-16 are operational. Based on how long previous buildings took, when they were in a similar state to Buildings 12-16 in December. |
| 2026-06-03 | 1.1 GW | 686,000 | Buildings 17-18 fully roofed but still having surrounding generators/cooling under construction. Cleared land for buildings 19-32 is still bare, with no building foundations visible yet. Based on satellite imagery. |
| 2026-10-19 | 1.2 GW | 818,000 | Buildings 17-18 are operational. This is an estimate based on a rule of thumb of "operational 5 months after roof is complete", assuming the roofs took one more month after 2025-12-23. Also added four more months to account for commissioning and adjacent cooling units not being complete yet. |
| 2028-03-17 (projected) | 2.3 GW | 1.7 million | Buildings 19-32 are operational. This is an estimate based on how long Buildings 1-16 took to become operational. In May 2026, the foundation of several buildings and a substation was visible at the site of Buildings 19-32. Buildings 1-16 took 1 year and 10 months to go from a similar state to operational. So we add 1 year and 10 months to May 2026 to get this date estimate. The power capacity is based on an [air quality permit](https://t.co/HsAO7oyKa2) filed in May 2026, and the compute capacity is based on Trainium3 chips. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-06-23 | Trainium2 | 457,200 | Reported |
| 2025-12-23 | Trainium2 | 718,400 | Estimate |
| 2026-03-23 | Trainium2 | 1,044,980 | Estimate |
| 2026-10-19 | Trainium2 | 1,044,980 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Anthropic-Amazon New Carlisle use?
Public data puts the facility power at about 1.2 GW, with about 2.3 GW planned by 2028. Reported (Epoch AI or owner data).
What chips does Anthropic-Amazon New Carlisle use?
Reported chips: Trainium2.
Who operates Anthropic-Amazon New Carlisle?
Amazon Web Services. Reported users: Anthropic.
Data centers near New Carlisle
- Data center in South Bend 3.5 km · 19 MW
- Data center in South Bend 3.7 km · 19 MW
- Project Ranier AWS Data Center 3.8 km · 97 MW
- Data center in South Bend 3.9 km · 19 MW
- Data center in South Bend 4.1 km · 19 MW
- Amazon AWS Data Center 5.2 km · 118 MW
- Microsoft Granger Data Center 32.0 km · 257 MW
- Microsoft Granger Data Center 32.4 km · 138 MW
More Amazon Web Services data centers
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
- Amazon Web Services United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.