Google Pryor (North)

Google Pryor (North) is an operational AI data center operated by Google in Pryor, United States. Its power is about 442 MW. Epoch AI estimates about 637,000 H100-equivalent AI chips (TPU v5p, TPU v5e).

Key facts

StatusOperational
OperatorGoogle
UsersGoogle DeepMind (speculative)
Facility power442 MW
Reported (Epoch AI or owner data)
IT power368 MW
AI compute637,000 H100-equivalents
AI chipsTPU v5p, TPU v5e
Reported (Epoch AI or owner data)
Chip count32,768
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 200,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 13.9 billion
Epoch AI estimate, 2025 USD.
Address4581 Webb St, Pryor, OK 74361
Coordinates36.24117, -95.33005

Build timeline

DatePowerH100eWhat the satellite images and filings show
2019-08-0100Land clearing begins for Building 1.
2024-07-1963 MW26,000Building 1 is operational, based on default roof-to-operational time.
2025-01-2863 MW26,000Building 2 is being retrofitted from a warehouse. The roof is being painted white, and cooling towers and a new substation are being built just south of the building (based on later imagery).
2025-10-1963 MW26,000The new substation for Building 2 looks mostly complete, half of the cooling towers are installed. The black patch in the top left of the building suggests that the new roof is not quite complete.
2026-05-2663 MW26,000Building 2 looks almost complete, but still appears to have three cooling towers missing. We therefore expect another 3 months until full operation.
2026-09-06442 MW637,000Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-07-19TPU v5p23,466Estimate
2024-07-19TPU v5e77,886Estimate

GPU clusters at this site

ClusterChipsCountPowerSince
Google Oklahoma TPU v4 PodsGoogle TPU v432,76824 MW2022-05-12

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Google Pryor (North) use?

Public data puts the facility power at about 442 MW. Reported (Epoch AI or owner data).

What chips does Google Pryor (North) use?

Reported chips: TPU v5p, TPU v5e.

Who operates Google Pryor (North)?

Google. Reported users: Google DeepMind.