Cable & Wireless Cable Landing Station
Cable & Wireless Cable Landing Station is an operational data center in Shirley, United States. Our footprint estimate of its power is about 6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 6 MW (range 3 MW to 9.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,001 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ramsey Road 21, 11967, Shirley |
| Coordinates | 40.84365, -72.88338 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Cable & Wireless Cable Landing Station use?
We estimate the facility power at about 6 MW. Estimate from building footprint, low confidence.
Data centers near Shirley
- Crown Castle Brentwood (1650 Islip) 29.1 km
- 365 Data Centers Commack (CNY) 34.4 km
- Aphorio Carter Trumbull Data Center 49.4 km · 32 MW
- Lumen West Haven 50.1 km
- Lumen New Haven 50.9 km
- CyrusOne data center in Norwalk 51.9 km · 13 MW
- CyrusOne Norwalk 52.5 km
- Data center in Wallingford 71.0 km · 4.9 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.