Data Center Directory

Cable & Wireless Cable Landing Station

Cable & Wireless Cable Landing Station is an operational data center in Shirley, United States. Our footprint estimate of its power is about 6 MW.

Key facts

StatusOperational
Facility power6 MW (range 3 MW to 9.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,001 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressRamsey Road 21, 11967, Shirley
Coordinates40.84365, -72.88338

Satellite view

Questions

How much power does Cable & Wireless Cable Landing Station use?

We estimate the facility power at about 6 MW. Estimate from building footprint, low confidence.

Data centers near Shirley

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.