CoreWeave Marble NC
CoreWeave Marble NC is an operational AI data center operated by CoreWeave in Marble, United States. Its power is about 91 MW. Epoch AI estimates about 79,000 H100-equivalent AI chips (B200).
Key facts
| Status | Operational |
|---|---|
| Operator | CoreWeave |
| Users | OpenAI (speculative) |
| Facility power | 91 MW Reported (Epoch AI or owner data) |
| IT power | 65 MW |
| AI compute | 79,000 H100-equivalents |
| AI chips | B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 36,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 2.5 billion Epoch AI estimate, 2025 USD. |
| Address | 155 Palmer Ln, Marble, NC 28905 |
| Coordinates | 35.18499, -83.91412 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-06-25 | 0 | 0 | Core Scientific announced that CoreWeave would receive about 70 MW of HPC infrastructure from 100 MW of owned infrastructure. Site modifications were expected to begin in H2 2024. |
| 2026-03-13 | 50 MW | 43,000 | The site has been energized. Two of three data halls had been delivered at [37 billable MW](https://www.sec.gov/Archives/edgar/data/1839341/000119312526165121/d149019dex992.htm), supporting about 15000 Grace Blackwell GPUs. The third hall was still in commissioning. |
| 2026-04-17 | 50 MW | 43,000 | Satellite imagery shows the main data hall and southern utility yard substantially complete. No new public MW disclosure, so this keeps the March 2026 public 36 MW state. |
| 2026-05-06 | 91 MW | 79,000 | Core Scientific said Marble was fully handed over to CoreWeave with about 65 MW of billable customer power online. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-03-13 | B200 | 17,200 | Estimate |
| 2026-05-06 | B200 | 31,100 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CoreWeave Marble NC use?
Public data puts the facility power at about 91 MW. Reported (Epoch AI or owner data).
What chips does CoreWeave Marble NC use?
Reported chips: B200.
Who operates CoreWeave Marble NC?
CoreWeave. Reported users: OpenAI.
Data centers near Marble
- Bonnie Lane 66.6 km
- LCUB Data Center 79.6 km
- Peace Communications KNX1 86.8 km
- Frontier (supercomputer) 90.2 km
More CoreWeave data centers
- Coreweave Helios United States
- CoreWeave Ellendale ND United States
- CoreWeave Denton TX United States
- CoreWeave Chester VA United States
- CoreWeave Muskogee OK United States
- CoreWeave Lancaster Greenfield site United States
- CoreWeave Norway Norway
- CoreWeave Dalton 1 & 2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.