Switch Las Vegas 12

Switch Las Vegas 12 is an operational data center in Enterprise, United States. Our footprint estimate of its power is about 5.5 MW.

Key facts

StatusOperational
Facility power5.5 MW (range 2.2 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 45,625 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.05799, -115.21033

Satellite view

Questions

How much power does Switch Las Vegas 12 use?

We estimate the facility power at about 5.5 MW. Estimate from building footprint, low confidence.

Data centers near Enterprise

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.