FirstLight data center in Portsmouth
FirstLight data center in Portsmouth is an operational data center operated by FirstLight in Portsmouth, United States. Our footprint estimate of its power is about 1.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | FirstLight |
| Facility power | 1.8 MW (range 0.9 MW to 2.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,488 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 770 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Aviation Avenue 77, Portsmouth |
| Coordinates | 43.07613, -70.80804 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does FirstLight data center in Portsmouth use?
We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.
Who operates FirstLight data center in Portsmouth?
FirstLight.
Data centers near Portsmouth
- University of New Hampshire data center in Durham 13.9 km · 4.2 MW
- Information Technology Data Center 15.6 km · 1.4 MW
- Navisite Andover 53.5 km
- Consolidated - 770 Elm St. 54.2 km
- TierPoint Boston - Andover 54.3 km · 6.8 MW
- ColoCenter.com - Manchester NH 55.0 km
- Crown Castle Manchester (1 Sundial Ave) 55.0 km
- ColoSpace - Bedford, NH 55.8 km
More FirstLight data centers
- Oxford Networks United States
Sources
Correct this page or get the data