Microsoft Goodyear
Microsoft Goodyear is an operational AI data center operated by Microsoft in Goodyear, United States. Its power is about 263 MW. Epoch AI estimates about 205,000 H100-equivalent AI chips (H100, B200).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Users | OpenAI (likely), Microsoft |
| Facility power | 263 MW Reported (Epoch AI or owner data) |
| IT power | 202 MW |
| AI compute | 205,000 H100-equivalents |
| AI chips | H100, B200 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 110,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 7.7 billion Epoch AI estimate, 2025 USD. |
| Also known as | PHX-11 · PHX-10 · PHX-12 |
| Address | 14250 W Broadway Rd, Goodyear, AZ 85338 |
| Coordinates | 33.40899, -112.36480 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2021-06-21 | 0 | 0 | Land clearing begins for Building 1. |
| 2023-04-24 | 53 MW | 29,000 | Building 1 operational. Based on interpolating satellite images from Sentinel-2 and Google Earth. |
| 2025-01-16 | 105 MW | 58,000 | Building 2 operational. Based on interpolating satellite images from Sentinel-2 and Google Earth. |
| 2025-09-01 | 263 MW | 205,000 | Building 3 and 4 operational. Based on interpolating satellite images from Sentinel-2 and Google Earth. |
| 2025-11-12 | 263 MW | 205,000 | Confirmation that Building 3 and 4 look complete. |
| 2026-04-27 | 263 MW | 205,000 | Foundations appear to be underway for Building 5 and 6, just north of Building 4. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2023-04-24 | H100 | 29,151 | Estimate |
| 2025-01-16 | H100 | 58,302 | Estimate |
| 2025-09-01 | B200 | 58,121 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Goodyear use?
Public data puts the facility power at about 263 MW. Reported (Epoch AI or owner data).
What chips does Microsoft Goodyear use?
Reported chips: H100, B200.
Who operates Microsoft Goodyear?
Microsoft. Reported users: OpenAI, Microsoft.
Data centers near Goodyear
- PHX-13 284 m · 21 MW
- Microsoft Goodyear Airpark Campus 555 m · 111 MW
- Stream Data Centers PHXA Campus 815 m · 47 MW
- Vantage Data Centers AZ2 Campus 889 m · 14 MW
- Stream Phoenix 1.3 km · 77 MW
- Stack Infrastructure PHX01 Campus 1.3 km · 26 MW
- Data center in Goodyear 3.6 km · 35 MW
- Compass Datacenters Goodyear Campus 3.9 km · 84 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
- Microsoft Grange Castle Ireland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.