STACK Infrastructure NVA02

STACK Infrastructure NVA02 is an operational data center that is still expanding, operated by STACK Infrastructure in Manassas, United States. Its power is about 118 MW, growing to about 487 MW by 2028-01. Epoch AI estimates about 61,000 H100-equivalent AI chips (H100).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorSTACK Infrastructure
Facility power118 MW
Reported (Epoch AI or owner data)
IT power85 MW
Planned power487 MW by 2028-01-01
Epoch AI timeline projection.
AI compute61,000 H100-equivalents → 251,000 planned
AI chipsH100
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 47,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 3.2 billion → 13.2 billion planned
Epoch AI estimate, 2025 USD.
Also known asSTACK NVA02D
Address9590 Hornbaker Rd, Manassas, VA 20109
Coordinates38.74637, -77.53687

Build timeline

DatePowerH100eWhat the satellite images and filings show
2019-10-1900Land clearing begins by Peterson Companies for Stack Infrastructure, which is noted in the [news](https://www.bisnow.com/washington-dc/news/data-center/peterson-cos-partnering-to-build-4m-sf-data-center-campus-in-manassas-102646) and visible on satellite imagery.
2024-10-01118 MW61,000Building 1 is operational, which is assumed to be three months after the last backup diesel generators are finished. The generators were first seen to be finished July 1 from satellite imagery [(a clear image of this can be seen on July 29 via Google Earth).](https://earth.google.com/web/search/38%c2%b044%2745%2e12%22N+77%c2%b032%2716%2e47%22W/@38.7458667,-77.5379083,83.89135729a,642.01325639d,35y,0h,0t,0r/data=CjQiJgokCTo0Rh9P7TVAETk0Rh9P7TXAGX6C6a6li0VAIQ_0AAa-ik7AKgYIARIAGAFCAggBQgIIAEoNCP___________wEQAA)
2026-02-14118 MW61,000All buildings have begun construction (with groundwork starting for AI building 6), as depicted by satellite imagery.
2028-01-01 (projected)487 MW251,000Estimate: All 6 AI data center buildings will be finished in 2028, assuming a groundbreak-to-operational timeline of 18-24 months. One is complete, three are clearly under construction, and the last two data centers are still breaking ground and laying foundations.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-10-01H10060,911Estimate

Satellite view

Questions

How much power does STACK Infrastructure NVA02 use?

Public data puts the facility power at about 118 MW, with about 487 MW planned by 2028. Reported (Epoch AI or owner data).

What chips does STACK Infrastructure NVA02 use?

Reported chips: H100.

Who operates STACK Infrastructure NVA02?

STACK Infrastructure.

Data centers near Manassas

More STACK Infrastructure data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.