CyrusOne data center in Council Bluffs is an operational data center operated by CyrusOne in Council Bluffs, United States. Our footprint estimate of its power is about 12 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power12 MW (range 5.8 MW to 19 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,659 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressGifford Road 4700, 51501, Council Bluffs
Coordinates41.21211, -95.87789
Websitedatacentermap.com/usa/iowa/council-bluffs/cyrusone-ocb1

Satellite view

Questions

How much power does CyrusOne data center in Council Bluffs use?

We estimate the facility power at about 12 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne data center in Council Bluffs?

CyrusOne.