Comcast data center in Greenwood is an operational data center operated by Comcast in Greenwood, United States. Our footprint estimate of its power is about 0.7 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Comcast |
| Facility power | 0.7 MW (range 0.3 MW to 1.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 563 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 47.69332, -122.31732 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Comcast data center in Greenwood use?
We estimate the facility power at about 0.7 MW. Estimate from building footprint, low confidence.
Who operates Comcast data center in Greenwood?
Comcast.
Data centers near Greenwood
- Level(3) Seattle (Denny Way) 8.4 km · 30 MW
- KOMO Plaza Seattle (Formerly Fisher Plaza) 8.6 km · 38 MW
- Digital Fortress (SEA) 8.9 km · 13 MW
- Digital Realty Seattle SEA10 8.9 km · 13 MW
- Equinix SE3 Data Center 8.9 km · 11 MW
- SBTC 9.2 km
- Kanobe, LLC 13.5 km
- BOTHWAXB - Bothell Central Office 13.9 km
More Comcast data centers
- Comcast United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.