Data center in Cheyenne
Data center in Cheyenne is an operational data center in Cheyenne, United States. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,646 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.12644, -104.89952 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Cheyenne use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
Data centers near Cheyenne
- Microsoft data center in Cheyenne 175 m · 5.3 MW
- Data center in Cheyenne 196 m · 14 MW
- Data center in Cheyenne 268 m · 5.8 MW
- University Corporation for Atmospheric Research data center in Cheyenne 323 m · 6.4 MW
- MineOne Wyoming Data Center 423 m · 4.6 MW
- ACT Cheyenne 523 m
- Microsoft CYS Datacenter 544 m · 131 MW
- CYS42 Datacenter 794 m · 6.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.