Data Center Directory

Microsoft-Nebius New Jersey

Microsoft-Nebius New Jersey is an operational AI data center operated by Nebius in New Jersey, United States. Its power is about 70 MW. Epoch AI estimates about 57,000 H100-equivalent AI chips (B300).

Key facts

StatusOperational
OperatorNebius
UsersMicrosoft (likely)
Facility power70 MW
Reported (Epoch AI or owner data)
IT power50 MW
AI compute57,000 H100-equivalents
AI chipsB300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 28,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 1.9 billion
Epoch AI estimate, 2025 USD.
Also known asDataOne Vineland
Address3963 S Lincoln Ave, Vineland, New Jersey
Coordinates39.42820, -75.01841

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-05-3100Land clearing begins for northern two buildings (Building 1-2).
2025-12-1500By mid-December 2025 the building was still not complete. A satellite analysis by SemiAnalysis found that the air-cooled chillers serving the second half of the first 50 MW phase were not yet installed, so the phase was not yet operational. SemiAnalysis estimated the full 50 MW would be reached around January to February 2026.
2026-04-1570 MW57,000High-resolution satellite imagery shows the air-cooled chiller array has grown to roughly 30 units, enough to support the first phase. We estimate Building 1 became operational around early 2026 with about 50 MW of IT capacity (70 MW total facility power at a 1.4 PUE), based on DataOne's disclosure of a first 50 MW phase. SemiAnalysis estimated the full 50 MW was reached around January to February 2026 ([SemiAnalysis](https://newsletter.semianalysis.com/p/stop-saying-half-of-2026-us-datacenter)); this April image is our first high-resolution confirmation that the cooling is in place.
2026-07-1270 MW57,000Compared with the April 2026 image, the building shell is closer to completion, and several additional air-cooled chillers have appeared on the ground, though they do not yet appear to be connected or operating. We therefore keep IT capacity at 50 MW.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-04-15B30022,500Estimate

Satellite view

Questions

How much power does Microsoft-Nebius New Jersey use?

Public data puts the facility power at about 70 MW. Reported (Epoch AI or owner data).

What chips does Microsoft-Nebius New Jersey use?

Reported chips: B300.

Who operates Microsoft-Nebius New Jersey?

Nebius. Reported users: Microsoft.

Data centers near New Jersey

More Nebius data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.