Aligned Data Centers
Aligned Data Centers is a data center under construction in El Mirage, United States. Our footprint estimate of its power is about 43 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 43 MW (range 17 MW to 109 MW) Estimate from building footprint, low confidence. Footprint estimate: about 362,017 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 18,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.56401, -112.38684 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Aligned Data Centers use?
We estimate the facility power at about 43 MW. Estimate from building footprint, low confidence.
Data centers near El Mirage
- Compass PHX II 5.5 km · 55 MW
- Microsoft Goodyear Campus 9.5 km · 81 MW
- Vantage Data Centers AZ1 Campus 13.0 km · 17 MW
- Compass Datacenters Goodyear Campus 13.6 km · 84 MW
- Data center in Goodyear 13.9 km · 35 MW
- Stream Phoenix 16.3 km · 77 MW
- Stack Infrastructure PHX01 Campus 16.6 km · 26 MW
- Stream Data Centers PHXA Campus 16.7 km · 47 MW
Sources
Correct this page or get the data