Aligned Data Centers

Aligned Data Centers is a data center under construction in El Mirage, United States. Our footprint estimate of its power is about 43 MW.

Key facts

StatusUnder construction
Facility power43 MW (range 17 MW to 109 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 362,017 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 18,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.56401, -112.38684

Satellite view

Questions

How much power does Aligned Data Centers use?

We estimate the facility power at about 43 MW. Estimate from building footprint, low confidence.

Data centers near El Mirage

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.