Data Center Directory

Microsoft Leesburg Building 5

Microsoft Leesburg Building 5 is an operational data center in Leesburg, United States. Our footprint estimate of its power is about 15 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
Facility power15 MW (range 7.4 MW to 24 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 12,381 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressInclusion Lane Southeast 41679, 20175, Leesburg
Coordinates39.06602, -77.55857

Satellite view

Questions

How much power does Microsoft Leesburg Building 5 use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Leesburg Building 5 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Data centers near Leesburg

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.