Data center in Hilliard

Data center in Hilliard is an operational data center in Hilliard, United States. Our footprint estimate of its power is about 36 MW.

Key facts

StatusOperational
Facility power36 MW (range 18 MW to 57 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 29,815 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.02077, -83.12418

Satellite view

Questions

How much power does Data center in Hilliard use?

We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.