Google Arcola Building 3 is an operational data center operated by Google in Sterling, United States. Our footprint estimate of its power is about 61 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).

Key facts

StatusOperational
OperatorGoogle
Facility power61 MW (range 30 MW to 97 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 50,660 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsGoogle TPU (plus NVIDIA GPUs for cloud customers)
Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips.
GPU capacity if all AIabout 26,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressHowling Rooster Lane 24555, 20166, Sterling
Coordinates38.94163, -77.53190

Satellite view

Questions

How much power does Google Arcola Building 3 use?

We estimate the facility power at about 61 MW. Estimate from building footprint, low confidence.

What chips does Google Arcola Building 3 use?

No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).

Who operates Google Arcola Building 3?

Google.