Google Fort Wayne
Google Fort Wayne is a data center under construction operated by Google in Fort Wayne, United States. No power figure is public for this site yet. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | |
| Users | Google DeepMind (speculative) |
| Planned power | 1.0 GW by 2028-06-23 Epoch AI timeline projection. |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| Investors | |
| Address | 6015 Adams Center Road, Fort Wayne, IN 46806 |
| Coordinates | 41.03093, -85.05363 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-04-01 | 0 | 0 | First signs of development/land clearing |
| 2024-09-13 | 0 | 0 | Roof complete on Building 1 (the 'H'), although we suspect this building is not for AI compute due to the construction speed, irregular design, and lack of external cooling. |
| 2025-06-10 | 0 | 0 | After a long quiet period they've laid foundations for Building 2 and the substation. |
| 2025-10-01 | 0 | 0 | Building 2 looks externally complete |
| 2026-03-01 | 0 | 0 | The cooling towers for Buildings 2 and 3 are both a little less than half done and the buildings still look like active construction sites. |
| 2026-08-19 | 0 | 0 | Building 2 has all cooling towers installed and is likely undergoing fit-out and commissioning. So we give it about 3 more months until it's operational. Building 3 appears to be slightly further than Building 2 was in March, so we estimate a 4-month lag. |
| 2026-12-01 (projected) | 207 MW | 383,000 | Estimated operational date of Building 2. |
| 2027-03-31 (projected) | 414 MW | 824,000 | Estimated operational date of Building 3. Based on Building 3 construction looking about 4 months behind Building 2. |
| 2027-08-28 (projected) | 621 MW | 1.4 million | Estimated operational date of Building 4. Based on Building 4 construction looking about 10 months behind Building 2. |
| 2028-01-25 (projected) | 828 MW | 2.1 million | Estimated operational date of Building 5. Based on previous buildings being separated by about 5 months. |
| 2028-06-23 (projected) | 1.0 GW | 2.9 million | Estimated operational date of Building 6. Based on previous buildings being separated by about 5 months. |
Source: Epoch AI Frontier Data Centers.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Google Fort Wayne use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
Who operates Google Fort Wayne?
Google. Reported users: Google DeepMind.
More Google data centers
- Goodnight United States
- Google Omaha United States
- Google Columbus United States
- Google Pryor (North) United States
- Google New Albany United States
- Google Storey County United States
- Google Lincoln United States
- Google Cedar Rapids United States