Compass PHX II is a data center under construction in Youngtown, United States. Our footprint estimate of its power is about 55 MW.

Power demand is growing at this site

Key facts

StatusUnder construction
Facility power55 MW (range 22 MW to 138 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 461,188 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 24,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.57632, -112.32892

Satellite view

Questions

How much power does Compass PHX II use?

We estimate the facility power at about 55 MW. Estimate from building footprint, low confidence.

Data centers near Youngtown

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.