Microsoft Granger Data Center is an operational data center in Granger, United States. Our footprint estimate of its power is about 138 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 138 MW (range 55 MW to 346 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,153,641 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 59,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.72896, -86.12010 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Granger Data Center use?
We estimate the facility power at about 138 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Granger Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Data centers near Granger
- Microsoft Granger Data Center 1.2 km · 257 MW
- GAP Union Station 13.1 km
- Aunalytics South Bend Datacenter (AUSB) 13.6 km
- Midwest Energy & Communications 24.4 km
- Data center in South Bend 28.8 km · 19 MW
- Data center in South Bend 29.1 km · 19 MW
- Project Ranier AWS Data Center 29.3 km · 97 MW