CyrusOne data center in Durham
CyrusOne data center in Durham is an operational data center operated by CyrusOne in Durham, United States. Our footprint estimate of its power is about 8.3 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CyrusOne |
| Facility power | 8.3 MW (range 4.1 MW to 13 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,908 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northeast Creek Parkway 2223, 27713, Durham |
| Coordinates | 35.93389, -78.88095 |
| Website | cyrusone.com/data-centers/north-america/durham-nc-dur1-dur2 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CyrusOne data center in Durham use?
We estimate the facility power at about 8.3 MW. Estimate from building footprint, low confidence.
Who operates CyrusOne data center in Durham?
CyrusOne.
Data centers near Durham
- CyrusOne NC-1 287 m · 43 MW
- TierPoint Research Triangle Park – RTP 4.1 km
- vXchnge Raleigh-Durham (NC01) 5.1 km
- Windstream Communications 6.4 km
- Brandaleone Lab for Data and Visualization 9.3 km
- Flexential - Raleigh (RAL01/02/03) 10.5 km
- iGLASS Networks 20.5 km · 1.1 MW
- American Tower RA1 21.4 km
More CyrusOne data centers
- CyrusOne NVA5 United States
- CyrusOne FRA3 Germany
- CyrusOne Sterling United States
- CyrusOne Aurora I United States
- CyrusOne Sterling NVA9 United States
- CyrusOne NVA14 United States
- CyrusOne Lebanon United States
- CyrusOne NC-1 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.