Data Center Directory

Data center in Wichita Falls

Data center in Wichita Falls is an operational data center in Wichita Falls, United States. Our footprint estimate of its power is about 3.9 MW.

Key facts

StatusOperational
Facility power3.9 MW (range 2 MW to 6.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,280 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 1,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAirport Drive 2236, 76306, Wichita Falls
Coordinates33.95337, -98.52479

Satellite view

Questions

How much power does Data center in Wichita Falls use?

We estimate the facility power at about 3.9 MW. Estimate from building footprint, low confidence.

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.