Time Warner Datacenter
Time Warner Datacenter is an operational data center in Centennial, United States. Our footprint estimate of its power is about 5.3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.3 MW (range 2.7 MW to 8.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,445 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | East Peakview Avenue 11011, 80111, Centennial |
| Coordinates | 39.59993, -104.86017 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Time Warner Datacenter use?
We estimate the facility power at about 5.3 MW. Estimate from building footprint, low confidence.
Data centers near Centennial
- Equinix DE1 - Denver 1.4 km
- DataBank Denver (DEN2) 1.5 km · 9.2 MW
- Flexential - Denver/Centennial (DEN05) 1.6 km · 4 MW
- Verizon 1.9 km · 0.7 MW
- Xfinity/Comcast Data Center 2.7 km · 5.4 MW
- H5 Data Centers Denver 3.4 km
- DataBank Denver (DEN1) 4.0 km · 1.3 MW
- Equinix DE2 - Denver 4.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.