Actapio

Actapio is an operational data center operated by Actapio in East Wenatchee Bench, United States. Our footprint estimate of its power is about 6.9 MW.

Key facts

StatusOperational
OperatorActapio
Facility power6.9 MW (range 2.8 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 57,763 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates47.40751, -120.21401
Websiteactap.io

Satellite view

Questions

How much power does Actapio use?

We estimate the facility power at about 6.9 MW. Estimate from building footprint, low confidence.

Who operates Actapio?

Actapio.