Actapio
Actapio is an operational data center operated by Actapio in East Wenatchee Bench, United States. Our footprint estimate of its power is about 6.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Actapio |
| Facility power | 6.9 MW (range 2.8 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 57,763 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 2,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 47.40751, -120.21401 |
| Website | actap.io |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Actapio use?
We estimate the facility power at about 6.9 MW. Estimate from building footprint, low confidence.
Who operates Actapio?
Actapio.
Data centers near East Wenatchee Bench
- Microsoft EAT02 1.1 km · 22 MW
- Microsoft EAT04 1.3 km · 21 MW
- Intergate Columbia 1.7 km · 31 MW
- Data center in East Wenatchee 1.7 km · 1.2 MW
- Intergate Columbia B 2.0 km · 17 MW
- Data center in Quincy 30.6 km · 19 MW
- Microsoft 30.9 km · 13 MW
- Azure OpenAI GPT-3 Cluster 31.2 km · 6.6 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.